Covering the drainage pipe with gravel

Source of the photo
BME ABÉT
Author of the description
Viktória Feigl

The drainage pipe was covered with 15 cm gravel so that the tested soils do not plug up the perforations of the drainage pipe. The gravel was covered with 2-3 cm sand. Approximatly 0,34 m3 prepared soil and mine waste was placed on the top.